STREAMBANK RESTORATION AT MANUELITAS CREEK-NM
Repeated flood events had severely eroded the riverbanks at this Manuelitas Creek site, washing out the original bridge and threatening the newly installed replacement. To quickly protect access and stabilize the channel, we installed a setback hard-armor system using large boulders placed along the banks. Riparian vegetation was preserved wherever possible to maintain habitat value and promote long-term bank strength. Work in waterways requires permits from agencies like the U.S. Army Corps of Engineers and the New Mexico Environment Department (NMED). HDE handled all permitting, documentation, designs, and mapping to ensure full regulatory compliance.